Upon completion, each relay panel is given a continuity test on the wiring.  The relay panels are then brought into our testing department for the functional test.  

Equipment is powered up, voltages are applied, and currents are pushed into the equipment per the schematics drawings.  Every relevant circuit on the AC and DC schematics is thoroughly checked by our technicians to ensure compliance with the wiring diagrams and the wiring done to the panel.

For control buildings, every building circuit is verified in addition to the relay panel wiring and cabling.

  HOW WE'VE HELPED



Quality Wiring
Posted by EP² in EP² Blog on 7/3/2013
Expert craftsmanship and attention to detail ensure that EP2 panels are built and wired to meet and exceed the systematic guidelines of our rigorous Quality Assurance Process.



  UPCOMING EVENTS


There are currently no upcoming events.